One-stop AP/RSE/RI/RGBC Services.
Expert in BD Structural Submissions.
APS Research Limited (APSR) is a structural consultancy firm specialised in submission of Additions and Alterations (A&A) Works, Minor Works (MW) and TPPEL Applications. Since 2018, APSR has completed more than 1,000 of A&A, MW and other smaller scale projects including (but not limited to) reinforced concrete (RC) works, steel works, curtain walls, aluminium/stone claddings, signboards, green walls, solar panels, tensile fabric canopies, glass walls, window walls, glass balustrades, demolition works, and structural surveys.
APSR partners with numerous independent Authorized Persons (AP), Registered Structural Engineers (RSE) and Registered Inspectors (RI) to execute many of the projects.
SERVICES

A&A WORKS
RC / Steel / Glass / Aluminium Works
Building Facade and Claddings
Signboards
Footings and Superstructures
Demolition and Reinstatement Works
Tensile Fabric Structures

MINOR WORKS
Windows
Internal / External Walls
Signboards
Protective Barriers
Slab Openings
Staircases

TPPE LICENCE
Indoor & Outdoor Decorations, Marquees, Stages, Booths, Lighting Towers Backdrops, and more

TEMPORARY WORKS
Design and Checking of Scaffolding / Propping / Formwork etc.

STRUCTURAL JUSTIFICATION / SURVEY
RSE-Endorsed
Structural Justification / Survey Reports

AP / RSE / RI /
RGBC / MWC
One-Stop All-Streams Endorsement Services and Site Supervision (TCPs)
SELECTED PROJECTS




Wall Planters at M+ Museum, West Kowloon
New Building Submission (Structural)
Each of the 111 wall-mounted planter cages are fabricated with 6mm stainless steel rods welded together, which also serves as a structural frame.




Aluminium Claddings at Union Hospital, Sha Tin
A&A Submissions (Structural)
- Erection of Aluminium Cladding for E&M Ducts
- Erection of Aluminium Cladding for Transformer Room at Roof


LED Signboard at K11 MUSEA, TST
Minor Works (Class 1) Submissions
- Erection of a 10m (W) x 4m (H) LED Signboard
- Separated into 2 MW Submissions

2024 Clockenflap

2024 Clockenflap

2024 Clockenflap

2024 Clockenflap
Clockenflap 2023 and 2024
TPPE Submission (Structural)
- Supporting ALL structures for the music festival
MORE A&A / NB PROJECTS




Structural Wall Openings and Louvres at Plaza Hollywood
February 2022
A&A Submission (Structural)
- Formation of Structural Wall Openings for Louvres Installation
- Conversion of Existing Curtain Wall to Metal Louvres



Skylight at Residence Oasis, TKO
February 2022
A&A Submission (Building + Structural)
- Replacement of Skylight Damaged Glass Panel



Steel Ramp and Platform at 9 Queen's Road Central
January 2022
A&A Submission (Building + Structural)
- Erection of Steel Ramp and Raised Floor Platform at Flat Roof




Staircase and Stair Hood at 3 Repulse Bay Road
January 2022
A&A Submission (Structural)
- Erection of RC Staircase (25/F to R/F) and Stair Hood (R/F)




Green Walls at The Mariners' Club, TST
January 2022
New Building Submission (Structural)
- Erection of External Green Wall Systems



Burberry Shop, Elements, West Kowloon
January 2022
A&A Submission (Structural)
- Reinstatement of RC Floor Openings and Steel Railings




RC Roof Openings at Polytechic University
January 2022
A&A Submission (Building + Structural)
- Formation of Temporary Openings at RC Roof for the Installation of Chiller Plants




Steel Frames at Caine Hill Clubhouse
January 2022
New Building Submission (Structural)
- Erection of Ceiling-Mounted Steel Frame for Suspended Sliding Doors and Seating Benches



Glass Canopy at Science Park
January 2022
A&A Submission (Building + Structural)
- Replacement of Canopy Damaged Glass Panel




Window Fins and AC Hoods at Yee On Court, Mongkok
December 2021
A&A Submission (Building + Structural)
- Removal of Existing RC Fins and AC Hoods (Deteriorated) for the Whole Building
- Erection of New Steel Fins and AC Hoods




Glass Balustrades at EAST 350, Kwun Tong
November 2021
New Building Submission (Structural)
- Erection of Glass Balustrade



Wall Opening at City University
November 2021
A&A Submission (Building + Structural)
- Formation of Door Opening at External RC Wall




Burberry Shop, Russell Street, Causeway Bay
November 2021
A&A Submission (Structural)
- Removal of Existing Burberry Building Facade & Wall Signboard
- Reinstatement of Stone Claddings & Glass Canopy




Glass Wall at Science Park
October 2021
A&A Submission (Building + Structural)
- Formation of Openings on Existing Glass Wall for Louvres Installation



Street Lamp at Regent Hill, Happy Valley
September 2021
A&A Submission (Building + Structural)
- Installation of Street Lamp onto the Existing RC Wall (with Stone Cladding) of the Building




Green Walls at The Harmonie, Cheung Sha Wan
September 2021
New Building Submission (Structural)
- Erection of External Green Wall Systems



Glass Walls at 1881 Heritage, TST
September 2021
A&A Submission (Building + Structural)
- Modification of Existing Glass Walls Layout




Maintenance Platform at Plaza Hollywood
September 2021
A&A Submission (Building + Structural)
- Erection of an External Steel Maintenance Platform and Cat Ladder to the Existing Skylight



Structural Wall Opening at Plaza Hollywood
August 2021
A&A Submission (Structural)
- Formation of a Structural Wall Opening for Louvre Installation




Green Walls at Union Church, Kennedy Road
July 2021
New Building Submission (Structural)
- Erection of External Green Wall Systems




Glass Balustrades at LYOS, Yuen Long
May 2021
New Building Submission (Structural)
- Erection of Glass Balustrades for Indoor Staircases




Green Walls at Seacoast Royale, Tuen Mun
March 2021
New Building Submission (Structural)
- Erection of External Green Wall Systems




Demolition Works at Hong Pak Court Carpark, Lam Tin
March 2021
ICU A&A Submission (Building + Structural)
- Removal of All Existing RC Planters at the Flat Roof of the Kindergarten




Demolition Works at No. 59 Perkins Road, Jardine Lookout
January 2021
A&A Submission (Structural)
- Removal of a 3-Storey Unauthorised Building Works (UBW)



Grease Trap at Kin Ming Estate, TKO
December 2020
ICU A&A Submission (Structural)
- Erection of an Underground RC Grease Trap



Wall Louvres at South Bay Villa, Hong Kong International School
September 2020
A&A Submission (Structural)
- Formation of External Wall Openings (Whole Building)
- Installation of Aluminium Wall Louvres (Whole Building)



Office Ward at Shek Lei (II) Estate, Kwai Chung
September 2020
ICU A&A Submission (Structural)
- Removal of Existing Steel Railings
- Erection of External Block Walls with Steel Frames



Curtain Wall at Argyle Street, Mong Kok
June 2020
A&A Submission (Building + Structural)
- Replacement of Damaged Glass Panel



Curtain Wall at Kwun Tong View
June 2020
A&A Submission (Building + Structural)
- Replacement of Damaged Glass Panel




Structural Wall Opening at Legoland, K11 MUSEA, TST
April 2020
A&A Submission (Building + Structural)
- Formation of Structural Wall Openings for E&M Routing




RC Wall Opening at TKO Gateway
January 2020
ICU A&A Submission (Building + Structural)
- Formation of RC Wall Openings
- Installation of Shop Front Glass Wall




Aluminium Cladding at HKJCBIR Building, HKU
August 2019
A&A Submission (Structural)
- Erection of External Aluminium Cladding with Steel Frame (5/F to R/F) for E&M Routings
CLIENTS
























CONTACT
+852 2351-3126
Corporate Office
1/F Sing Kui Commercial Building, No. 27 Des Voeux West, Sheung Wan, Hong Kong
Engineering Workshop
Unit 1104, 11/F, Orient International Tower, 1018 Tai Nan West Street, Lai Chi Kok, Hong Kong